Project example: Interlinked stations for the assembly and testing of electric power steering drives
- Station 1: force/displacement monitored joining and torque monitored bolting of engine and ECU
- Station 2: Verification of the software status, with variant-dependent parameterization
- Station 3: Leak test as negative pressure test alternatively as positive pressure test
- Station 4: Function and noise testing including order analysis